Posts

Giardina MSL Lines

The automatic tray system has been designed and built to optimize the painting and drying of doors, panels and profiles. This system combines the manual painting cycle with the drying cycle, eliminating the need to handle the parts during the various phases.

The Giardina Manual Spray Line can be configured and sized according to the process needs and the expected productivity.

 





For more information, email sales@schuberts.co.uk

New 420 Automatic Spray Machine Launched

Schuberts presents the Giardina “Dualtech 420”, the first stage of the renovation process that will affect the entire range of “Dualtech” automatic through-fee spraying machines, a technology that represents fifty years of experience in spray painting in the name of quality, reliability, flexibility and ease of use.


Among the most interesting technical features the two opposing painting arms that guarantee an optimal application both on the surface and on the edges of the panel and the technology for the recovery of the paint that falls on the conveyor belt and the cleaning system of the latter, solutions that have no equal in terms of very low consumption of the cleaning solvent, a longer life of the belt, and a high simplicity of operation.


Each machine in the “Dualtech” range can be equipped with accessories and technological solutions to further increase flexibility, productivity, and reliability, such as the quick gun exchange system “Dualfast”, which allows you to change guns – and consequently the spraying cycle – in less than 60 seconds or the automatic vertical positioning system of the guns, or the electronic control of the ventilation inside the spray chamber, perfect for extending the efficiency and operating time of the sprayer.

 

For more information, email sales@schuberts.co.uk

 





 

 

Out With The Old And In With The New In Toronto

If you want to offer a full range of career-focused education, training and applied research programs to prepare people for success in the new knowledge economy and promote economic prosperity throughout Canada, you want the very best equipment, right?

 

An old installation was well past its prime, so Yorke Towne, our working partners in Canada were key in making the new finishing installation from Schuberts an outstanding one.

 

So, out with the old:-

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

And in with the new, custom built, flash-off and Schubox gas catalytic infrared drying system:-

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

After spraying, the products go into the flash-off zone and then into the Schubox for rapid and safe drying.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Not only are our systems CSA certified, but we also carry INTERTEK and TSSA classification for the Canadian markets.

 

For more information, please email contact@yorketowne.com or sales@schuberts.co.uk

 

 

2nd Giardina Spray Line Installed At Door Manufacturer

One of the UK’s largest manufacturers of timber doors and components has taken delivery of a another new, second, Giardina profile spray line from Schuberts.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

The ATEX certified line, running at 30m/min, is able to coat both simple and complex door components to a very high level of quality.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

The spray machine is fitted with 3 Wagner automatic guns and pump system, able to deliver accurate film weights time and again.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

The same line, can also spray MDF profiles, waterbased or 2k products.

 

For more information, email sales@schuberts.co.uk

New Giardina Auto-Spray Line Installed For A Very Special Use

One of the worlds largest manufacturers of engineered sealing solutions has taken delivery of a custom width Giardina coating line from Schuberts.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Built to a working width of 1500mm, this line sprays a very accurate layer of product, recovers all the overspray, to be filtered and used again and then dried inside an inline drying tunnel.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

The automatic belt cleaning system on the spray machine means that all overspray is recovered. It then passes through filters and back into a constant mixing stainless steel tank, before being dosed back into the machine.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

The automatic guns are positioned inline and fitted with very accurate nozzles and the machine has the ability to control flow, pressure and therefore build-up of coating.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Once sprayed, the product goes into a high speed jetted air oven, connected to in-line waterheaters and heat exchanges so the oven can run at a steady 70-80c irrespective of the factory temperature.

 

Running at 6m/min, this really is a special fully automatic Giardina spray line supplied by Schuberts!

Ever wondered what a Giardina Vertical Oven looks like and works?

The four-stage vertical oven designed and built by GiardinaGroup and available through Schuberts, optimally performs the four phases that characterize a perfect drying process: flash-off, first heating, second heating, and finally cooling.





 

The drying curve is guaranteed by the four stages in which the oven is structured, one for each phase, and each stage is separated from the other by dividing panels. In other two- or three-stage ovens, instead, some of the four phases are performed in the same spaces, therefore a homogeneous separation between them is not guaranteed and the zones are joined, mixing air and conditions inside – a less than ideal situation!

 

 

 

 

 

 

 

 

 

 

 

The version of four-stage vertical oven presented in the above video link, adopts a belt tray system, perfect for small pieces (there are no dangers related to their handling or dropping through) and for large and heavy elements which, being able to rest on a large and regular surface, do not risk any damage or marking to the contact surface already painted, with the tray system offered by others.

 

 

 

 

 

 

 

 

 

 

 

 

On request, it is possible to have the GiardinaGroup four-stage oven in an ideal set-up for those who have to process both thin pieces (flat doors) and high-thickness ones (curved doors): by reducing the number of trays the problem is solved, keeping the duration in each phase and for each product, whatever its thickness, constant and homogeneous.

 

For more information, email sales@schuberts.co.uk

Canadian Manufacturer Takes Delivery Of A New Finishing System From Schuberts

A new Schubert installation has been made, with our partners at Yorke Towne, at one of Canada’s premier residential and commercial manufacturing companies, supplying their customers for over 20 years.

 

The installation comprises of a fully custom built flash-off and Schubox drying system, connected to a manual spray shop.

 

 

 

 

 

 

 

 

Once sprayed, the product is taken into the flash-off zone to settle and vent. The flash-off air is taken into the Schubox for oxidisation of VOC’s.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

After flash-off, the Schubox is next. Working at just 40c, it pulls the solvent carriers out and cross-links the coating in record time. After 30 mins in the Schubox, the coatings are perfectly dry and ready for either denibbing or fitting up after topcoat.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

For more information on manual spray systems, enclosures, flash-off zones and Schubox gas catalytic infrared systems, email sales@schuberts.co.uk

Kitchen Manufacturer Installs New Automatic Line

One of the largest and best-known kitchen manufacturers has taken delivery of a special fully automatic Giardina spray line, installed by Schuberts.

The line consists of:-

•Infeed conveyor for batch loading onto the system.


 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

•Cleaning and deionising machine to ensure panels and parts are clean prior to spraying.

 

 

 

 

 

 

 

 

 

 


•Fully automatic spray machine with 2 circuits and 4+4 guns with the unique Dualfast system.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 


•GPM multi level oven.

 

 

 

 

 

 

 

 

 

 


•UV curing tunnel.


•Outfeed conveyor and inspection zone.

The line is running at 3m/min and gives a perfect finish every time!

For more information email sales@schuberts.co.uk

 

#finishing #finishingdoneright #giardinagroup #schuberts #partners #teamwork #ukinvestment #quality

Giardina Profile Spray Line Installed For Door Producer

A new Giardina profile automatic spray line has been installed at one of the UK’s largest producers of timber doors and door sets.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

The customer is providing high quality products ideally suited to the health, education, commercial, leisure, office fit out and high end residential markets.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Running at 30m/min, it can deal with waterbased or solvent based coatings in single pack and 2k for primers, mid-coats and top-coats.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

With a denibbing brush sander offline, it will coat from 20mm to 300mm widths, even on the most complex door profiles.

 

For more information, email sales@schuberts.co.uk

New Giardina Glass Roller Coating Finishing Line Installed

One of the UK’s largest glass processing companies has taken delivery of a custom built Giardina Group glass rollercoating finishing line.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

The line, with a fantastic working width of  anywhere between 700mm and 2200mm, is designed for a full colour range of ceramic coatings.

 

The line consists of end AND side infeed roller conveyor, with pop up rollers.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Roller coating machine G02, mounted on floor rails and wheels for easy removal out of the line. It also has rollers top and bottom (not belts) to ensure perfect application thickness of coatings. There is also the self cleaning washing equipment for quick colour changing.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Roller conveyor with lexan hinged hood for flash-off and inspection of coating before the drying tunnel.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Drying and cooling sections with electric IR, recirculated air and venting water vapour to atmosphere. Again, with hinged sections to access the internals of the tunnels.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Out feed roller section and then finally an automatic lift station to take the coated glass into the vertical position.

 

 

 

 

 

 

 

 

 

 

 

 

For more information on automatic Giardina glass coating solutions available through Schuberts, contact sales@schuberts.co.uk